The Hibernia platform has three separate components: Topsides, Gravity Base Structure (GBS), Offshore Loading System (OLS). The completed platform was towed to the Hibernia oil field and positioned on the ocean floor in June of 1997 and began producing oil on November 17, 1997. The platform stands 224 meters high, which is half the height of New York’s Empire State Building and 33 meters taller than the Calgary Tower.
Subscribe to Spark for more amazing science, tech and engineering videos https://goo.gl/LIrlur
Follow us on Facebook: / sparkdocs
Follow us on Instagram: https://www.instagram.com/spark_chann...
Content licensed from Kew Media to Little Dot Studios. Any queries, please contact us at: [email protected]
#HiberniaGBS #OilRig #OilPlatform #spark #sparkdocumentary #sciencedocumentary